top of page

SR 520 Construction Tour

On this tour, YPT had a great excursion onto the new SR 520 floating bridge, catching a fascinating glimpse of the immensity of this project. After meeting in Medina, WSDOT took us on an in depth look both above and below the main deck. Our amazing tour guides discussed everything from the lane alignment, to the anchoring work requiring divers, to bird ramps. What a great way to start off a Friday morning.

Featured Posts
Recent Posts
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
bottom of page