2013© | 2019 YPT Seattle

SR 520 Construction Tour

October 24, 2015

 

On this tour, YPT had a great excursion onto the new SR 520 floating bridge, catching a fascinating glimpse of the immensity of this project.  After meeting in Medina, WSDOT took us on an in depth look both above and below the main deck.  Our amazing tour guides discussed everything from the lane alignment, to the anchoring work requiring divers, to bird ramps.  What a great way to start off a Friday morning.  

 

 

 

Please reload

Featured Posts

East Link Tunnel Tour

February 23, 2018

1/3
Please reload

Recent Posts

March 15, 2019

September 24, 2018

May 23, 2018

February 23, 2018

Please reload

Archive
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square